AB Projects Limited, of Sharjah, United Arab Emirates, offers a complete and turnkey bottling plant ready to start in a 40-foot container. The Samar 120 can fill 120 bph of the 5-gallon bottles and requires only two to three operators. The mobile plant can be set up and removed within minutes of reaching the water source. The Samar 120 can handle surface water from rivers and lakes. This allows the investor to be flexible instead of operating in a classical building.